Four Trips

Via Raconteur Report

As legend and lore have it, no DIY project can be completed in anything less than three trips to the store. Yesterday and today, I improved on that.

About a month ago, the local merchants were flogging perfectly spiffy UHD TVs at ridiculous prices, so they could get the newest models in with even more features I don’t want, at prices I won’t pay. So a big screen for less than half price for a NIB set was worth the trip.

Where, due to work schedules, it sat on the floor for about a month.
So with a few days off, it was time to upgrade my movie viewing (I have not watched broadcast TV since Fat Bill was president, and miss it not a bit).

Having assembled most of what I needed, it was time to get to work.
I’ve got three cordless drills, and two chargers.

Continue reading “Four Trips”

Innerspace (NMF part 5)

With the interior skeleton largely in place it is time to turn my attention to putting some skin on these bones–the inside bones anyway.

So to begin, first we have to ensure that there is a layer of dampening material between each layer of the structure.  In this case I’m using an underlayment foam.  It is relatively inexpensive, easy to come by (the flooring isle), and effective in covering a large surface area.  This is partly to dampen the wall surface and partly to help create another layer to seal one side from the other.  It isn’t much of a barrier to sound, but it does help.

Beginning with the roll foam:

Continue reading “Innerspace (NMF part 5)”

A Fine Errection (NMF part 4)

https://www.theburningplatform.com/2017/02/17/its-not-my-fault-part-3/

The title of this section was carefully designed to get Stucky to at least open this post.  He may not read it, but while NickelthroweR inspired me to get started, Stucky’s equally amazing DIY narratives encouraged me nearly as much.

So here begins the part where it gets really hard…really.

Just not this way:  (Stucky at home reading TBP)

Continue reading “A Fine Errection (NMF part 4)”

It’s not my fault…. (Part 3)

Laying the Foundation

For the backstory see:

https://www.theburningplatform.com/2017/02/12/its-not-my-fault-part-1/

https://www.theburningplatform.com/2017/02/17/its-not-my-fault-part-2/

As with nearly any building project, big or small, you build the base and work up from there.  This project is no different; however, we want our base to have a few interesting and unusual properties.  In this case we want our base to provide access for ducting, we want it to be as isolated as we can make it, and we want it to be easily portable.  Easily portable?  That is absolutely essential.

Continue reading “It’s not my fault…. (Part 3)”